Pressix CC 27 - Channel System
Channel Holder MOF 27
Application
To be used for installing crossbars between two Channels MS 27 or as base unit for projecting channels.
Note: When assembling version MH as cantilever, consider sufficient bracing of the channel. In case of tension load Fz at channel slot, screws must be displaced.
Scope of delivery
Completely assembled.
Installation
Position the channel into the U-profile. Click in the Speed Nut by pushing on the bolt head and tighten with 10 Nm.
Technical Data
Adm. anchor loads to be respected Max. adm. load for assembly on ceilings in vertical direction: 0,8 kN | |
Material: | Steel, electro-galvanised |