Assembly Group BG11 MS41-1/2"
Application
An Assembly Group containing components to make up a permanent pipe connection with the heavy Pipe Clamp Stabil I-1/2". The Assembly Group is designed for use with the Sikla 41 channel system. The height is adjusted via the Threaded Tube 1/2".
Scope of delivery
Each Assembly Group is pre-assembled, packed and labeled.
Parts list:
Item 1 Pipe Clamp Stabil I-1/2"
Assembly Kit MKit MS 41 1/2" consists of:
Item 2 Threaded Tube GR 2 m 1/2" x 200
Item 3 Locking Nut NT G 1/2"
Item 4 Adapter AD IG/IG 1/2"/M16
Item 5 Holding Bracket HK 41/16
Item 6 T-Head Bolt TBO HZ41 M16 x 25
Installation
The assembly of the individual components to form an Assembly Group is carried out during the course of pipe installation on the construction site.
Technical Data
Lmax, vertical = 200 mm
Lmax, horizontal = 150 mm
Material: | |
Pipe clamp and connecting parts: | Steel, HCP |
Bolts and nuts: | Steel, HCP |